Final | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Daryl DeGrange
|
|
|
will Phone #: ###-#### final ok
|
Conference | 7/18/2011 | 7/18/2011 | 7/18/2011 | P | DONE |
Daryl DeGrange
|
|
|
will Phone #: ###-#### Home owner wanted walk through before final inspection
|
Permanent Service | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | PASS |
Daryl DeGrange
|
|
|
p/s u/g rec ok
|
Temporary Service | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | CANC |
Daryl DeGrange
|
|
|
will Phone #: ###-####
|
Permanent Service | 5/26/2011 | 5/26/2011 | 5/26/2011 | P | FAIL |
Daryl DeGrange
|
|
|
Will ###-#### NEC 408.36 except. 2 A panelboard shall not contain more than 42 overcurrent devices. forty circuit panel, 48 breakers, shall not alter breakers to fit panel busing, quad breakers
|
Electrical Rough-In | 3/17/2011 | 3/18/2011 | 3/18/2011 | A | PASS |
Daryl DeGrange
|
|
|
will Phone #: ###-#### rough-in ok corrections done
|
Electrical Rough-In | 3/15/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Daryl DeGrange
|
|
|
a/c circuit and 120 volt gcfi w/r receptacle
|
Electrical Rough-In | 1/18/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Daryl DeGrange
|
|
|
will Phone #: ###-#### - please call 1/2 hr prior ri ok to cover exterior wall and ceiling insulate only
|
Conference | 1/11/2011 | 1/13/2011 | 1/13/2011 | A | DONE |
Daryl DeGrange
|
|
|
call when on way out to meet//Will Phone #: ###-#### Discussed with home owner service equipment overcurrent,romex protection, general wiring requirements
|
Electrical Rough-In | 9/27/2010 | 9/28/2010 | 9/28/2010 | P | PASS |
Bob Reichert
|
|
|
conduit before pour foundation//Will ###-#### ok pour foundation
|