Final | 8/25/2011 | 8/26/2011 | 8/26/2011 | A | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates final ok
|
Conference | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | DONE |
Daryl DeGrange
|
|
|
Chris is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates contractor had questions on work desks found UL listing tags and generator cabnet door clearance-doors will open 90 degrees
|
Electrical Rough-In | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Daryl DeGrange
|
|
|
3rd floor ceiling inspection. Shane is the contact his no. is ###-####. >> Inspection requested via web by Shawna Gates rough-in ok cover remainder of 3 rd floor ceiling grid.
|
Electrical Rough-In | 7/18/2011 | 7/19/2011 | 7/19/2011 | A | PASS |
Daryl DeGrange
|
|
|
Ceiling inspection. Shane is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover ceiling grid. 3rd floor outside perimeter
|
Conference | 7/12/2011 | 7/13/2011 | 7/13/2011 | A | DONE |
Daryl DeGrange
|
|
|
Outdoor generator clearance requirements. Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates
|
Electrical Rough-In | 6/30/2011 | 7/1/2011 | 7/1/2011 | A | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his no. is ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ceiling grid 2nd floor
|
Electrical Rough-In | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | PASS |
Bob Reichert
|
|
|
Chris is the contact his no. is ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates ok cover ceiling 1st floor
|
Conference | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | DONE |
Daryl DeGrange
|
|
|
Chris is the contact his cell is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Discussed location of sprinkler piping in service gear room, NO piping over foot print of service gear NEC 110.26(F)(1)(a)
|
Electrical Rough-In | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the onsite contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ceiling grid ok classrooms 107/114 only
|
Permanent Service | 5/13/2011 | 5/13/2011 | 5/13/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the onsite contact, his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates p/s ok, need Idaho Power `s AFCI sheet before final
|
Electrical Rough-In | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok server room ceiling change to hard lid
|
Electrical Rough-In | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok 3rd floor interior walls
|
Electrical Rough-In | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok 2 nd floor interrior walls
|
Electrical Rough-In | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PASS |
Daryl DeGrange
|
|
|
Underground. Chris is the contact his no is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover underground
|
Electrical Rough-In | 4/5/2011 | 4/5/2011 | 4/5/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok exterrior walls 3rd floor
|
Electrical Rough-In | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | PASS |
Daryl DeGrange
|
|
|
Chris is the contact. His no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover generator trench
|
Electrical Rough-In | 3/30/2011 | 3/31/2011 | 3/30/2011 | A | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates ri ok reception desk/trench- floor boxes
|
Electrical Rough-In | 3/25/2011 | 3/28/2011 | 3/28/2011 | A | PASS |
Jack Frank
|
|
|
Chris is the onsite contact his cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok
|
Electrical Rough-In | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PASS |
Daryl DeGrange
|
|
|
Chris is the contact his no. is ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates ri ok north side
|
Electrical Rough-In | 1/20/2011 | 1/21/2011 | 1/21/2011 | A | PASS |
Bob Reichert
|
|
|
Chris is the onsite contact, his cell no. is ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 3rd floor ok to pour
|
Electrical Rough-In | 12/2/2010 | 12/3/2010 | 12/3/2010 | A | PASS |
Daryl DeGrange
|
|
|
Underground. Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates ri ok floor plugs
|
Electrical Rough-In | 11/11/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Bob Reichert
|
|
|
Grounding inspection. Chris is the contract his no. is ###-####. Thank you! Phone #: ###-#### >> Inspection requested via web by Shawna Gates ok at service area
|
Electrical Rough-In | 11/11/2010 | 11/18/2010 | 11/11/2010 | P | CANC |
Daryl DeGrange
|
|
|
Grounding. Chris is the contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
|
Electrical Rough-In | 11/3/2010 | 11/4/2010 | 11/4/2010 | P | PASS |
Daryl DeGrange
|
|
|
underground only Phone #: ###-#### >> Inspection requested via web by Shawna Gates ri ok
|
Electrical Rough-In | 11/2/2010 | 11/3/2010 | 11/3/2010 | A | PASS |
Daryl DeGrange
|
|
|
underground for concrete floor. Chris Wright is contact person on site Phone #: ###-#### >> Inspection requested via web by Shawna Gates ug ok eastside only
|
Electrical Rough-In | 10/13/2010 | 10/14/2010 | 10/14/2010 | A | PASS |
Bob Reichert
|
|
|
Underground-Chris is the onsite contact his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates u/g ok
|
Electrical Rough-In | 9/30/2010 | 9/30/2010 | 9/30/2010 | P | PASS |
Bob Reichert
|
|
|
This is a Ufer ground inspection. The contractor is wanting to pour at noon. Please inspect as soon as possible. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates ok to pour gec
|