Final | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | PASS |
Daryl DeGrange
|
|
|
Tim Phone #: ###-#### final ok
|
Final | 4/4/2011 | 4/6/2011 | 4/6/2011 | A | NR |
Daryl DeGrange
|
|
|
tim Phone #: ###-####
|
Electrical Rough-In | 3/18/2011 | 3/18/2011 | 3/18/2011 | P | PASS |
Daryl DeGrange
|
|
|
tim - porch inspection Phone #: ###-#### rough-in ok front porch
|
Electrical Rough-In | 12/30/2010 | 1/3/2011 | 1/3/2011 | A | PASS |
Daryl DeGrange
|
|
|
tim Phone #: ###-#### ri ok
|
Conference | 12/10/2010 | 12/13/2010 | 12/13/2010 | A | DONE |
Daryl DeGrange
|
|
|
Timothy Phone #: ###-#### discuss service panel clearances
|
Electrical Rough-In | 12/6/2010 | 12/7/2010 | 12/6/2010 | A | PASS |
Daryl DeGrange
|
|
|
tim - tench Phone #: ###-#### ri ok trench ok to cover
|
Conference | 12/3/2010 | 12/6/2010 | 12/6/2010 | A | DONE |
Daryl DeGrange
|
|
|
Tim Phone #: ###-#### discuss service feeders-grouding conductor, receptacle layout-arcfault circuits,box fill
|