Final | 1/19/2011 | 1/19/2011 | 1/19/2011 | P | PASS |
Bob Reichert
|
|
|
the final cabinet has been set and wired (ready now for final) thank you Phone #: ###-#### >> Inspection requested via web by Brad Baker ok to final, no card to sign
|
Final | 1/12/2011 | 1/13/2011 | 1/13/2011 | A | NR |
Jack Frank
|
|
|
Please call with any questions thank you Phone #: ###-#### >> Inspection requested via web by Brad Baker called everything ok still needs counter built
|
Electrical Rough-In | 1/3/2011 | 1/3/2011 | 1/3/2011 | P | PASS |
Daryl DeGrange
|
|
|
requesting an inspection of the show room area ceiling for cover thank you Phone #: ###-#### >> Inspection requested via web by Brad Baker ri ok show room area only
|
Electrical Rough-In | 12/12/2010 | 12/13/2010 | 12/13/2010 | A | PASS |
Jack Frank
|
|
|
new walls ready for rough in inspection for cover Phone #: ###-#### >> Inspection requested via web by Brad Baker middle of blb
|
Electrical Rough-In | 12/7/2010 | 12/7/2010 | 12/7/2010 | P | PASS |
Bob Reichert
|
|
|
need an inspection for cover on the 2-PVC''s installed in the floor from wall to cabinet thank you Phone #: ###-#### >> Inspection requested via web by Brad Baker u/g ok
|