Final | 8/1/2011 | 8/2/2011 | 8/2/2011 | A | PASS |
Daryl DeGrange
|
|
|
FINAL ELECTRICAL. REQUESTING AROUND 9:00AM IF POSSIBLE. CONTACT IS TOM HACKMAN. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery final ok
|
Final | 8/1/2011 | 8/1/2011 | 8/1/2011 | P | NR |
Daryl DeGrange
|
|
|
Contact on job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery no access to gymnasium for inspection
|
Final | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | FAIL |
Daryl DeGrange
|
|
|
Final for building except a grid inspection in the kitchen. Contact on job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery NEC 210.8 (A) (5) Unfinished basements (storage areas) and (work areas) shall have GFCI protection in all 120 volt 15 and 20 ampere receptacles
|
Final | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PART |
Daryl DeGrange
|
|
|
Final inspection for the 1st and 2nd floor main building existing areas. Contact is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery 1 & 2 floors except basement=kitchen-gymnasium
|
Electrical Rough-In | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Daryl DeGrange
|
|
|
Grid inspection for the upstairs. Contact is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok cover grig second floor-last two rooms raised floor area
|
Electrical Rough-In | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | PART |
Bob Reichert
|
|
|
Second floor grid inspection. Contact on job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery second floor ceiling except 2 rooms up ramp ok- not supposed to be any borders up
|
Electrical Rough-In | 7/5/2011 | 7/5/2011 | 7/5/2011 | P | PASS |
Daryl DeGrange
|
|
|
Need a grid inspection and a partial final of the first floor classrooms. Contact on the job is Tom Hackman - please confirm areas to be inspected with Tom. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok cover 1st floor grid
|
Electrical Rough-In | 5/3/2011 | 5/3/2011 | 5/3/2011 | A | PASS |
Daryl DeGrange
|
|
|
Hard-lid rough inspect on first floor. Contact is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok hard lid areas 1st floor
|
Electrical Rough-In | 4/18/2011 | 4/18/2011 | 4/18/2011 | P | PASS |
Daryl DeGrange
|
|
|
Rough electrical inspection of the first floor new addition kitchen and the second floor new addition classroom and the library area. Contact onsite is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok SE stairway-1st floor kitchen 2nd floor library
|
Electrical Rough-In | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PASS |
Daryl DeGrange
|
|
|
This is a rough electrical inspection of the Basement area and the Main Floor Stairwells. Contact on the job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery rough-in ok basement & west stairwell ok cover
|
Electrical Rough-In | 4/4/2011 | 4/5/2011 | 4/5/2011 | A | PART |
Daryl DeGrange
|
|
|
This is a rough electrical inspection for the 2nd floor corridor and classrooms only. Please see Tom Hackman onsite for specific areas. Contact on job is Tom Hackman. Phone #: ###-#### >> Inspection requested via web by Richard partial cover for rough-in 2nd floor ok except stairwells
|
Electrical Rough-In | 2/16/2011 | 2/17/2011 | 2/17/2011 | A | PASS |
Daryl DeGrange
|
|
|
Roosevelt School Remodel - Rough electrical inspection of the basement and first floor. Contact is Tommmy Hackman. Phone #: ###-#### >> Inspection requested via web by Richard Montgomery ri ok walls 1st floor only
|