Final | 12/29/2010 | 12/29/2010 | 12/29/2010 | P | PASS |
Jack Frank
|
|
|
Corrections completed Phone #: ###-#### >> Inspection requested via web by Todd Alder t/s o/h new ok
|
Final | 12/21/2010 | 12/21/2010 | 12/21/2010 | P | FAIL |
Jack Frank
|
|
|
Code Corrections Made - Cleaned busing, changed transformer from 208 to 240 Phone #: ###-#### >> Inspection requested via web by Todd Alder called corr. posted grd both high and low voltage services 250.20, 24, 30 230.2 plaques for 480 and 120/240 services, 210.5(C) id branch circuits of both systems
|
Temporary Service | 12/16/2010 | 12/16/2010 | 12/16/2010 | P | FAIL |
Jack Frank
|
|
|
Connected job trailer to existing service Existing temp power pole and service located by Gas Sphere on Southwest end of Treatment Plant Phone #: ###-#### >> Inspection requested via web by Todd Alder called t/s not approved too much too note
|