Final | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | PASS |
Daryl DeGrange
|
|
|
Idaho power has checked the mast and contractor has checked Phone #: ###-#### >> Inspection requested via web by Don Conley final ok
|
Final | 2/7/2011 | 2/8/2011 | 2/8/2011 | A | PART |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Don Conley inside ok to final, need to see mast after power co. re-conductors house
|
Electrical Rough-In | 1/18/2011 | 1/19/2011 | 1/19/2011 | P | PASS |
Daryl DeGrange
|
|
|
Call Troy ###-#### Phone #: ###-#### >> Inspection requested via web by Don Conley ri ok
|
Permanent Service | 1/7/2011 | 1/7/2011 | 1/7/2011 | A | PASS |
Daryl DeGrange
|
|
|
p/s o/h rec ok
|
Conference | 1/6/2011 | 1/7/2011 | 1/7/2011 | A | DONE |
Daryl DeGrange
|
|
|
Call Don ###-#### Phone #: ###-#### >> Inspection requested via web by Don Conley Discuss power returned to service for heat after fire 1/06/11
|