Final | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Doug A Poedy
|
|
|
Greg-Please call at least 30 mins prior to inspection Phone #: ###-####
|
Final | 3/18/2011 | 3/18/2011 | 3/18/2011 | P | FAIL |
Jack Frank
|
|
|
greg Phone #: ###-#### met owner explained code requirements, shall replace damaged 3 gang box bath rm splice all equip grd together, provide 6" free conductor, loose splices, seal unused KOs subpanel, remove equip grds from neutral buse at subpanel, needs 4 wire recept, pigtail, and cable from subpanel to dryer
|
Electrical Rough-In | 1/21/2011 | 1/21/2011 | 1/21/2011 | P | PART |
Bob Reichert
|
|
|
Greg Phone #: ###-#### ok cover, need to see make-up before final
|
Conference | 1/13/2011 | 1/14/2011 | 1/14/2011 | A | DONE |
Bob Reichert
|
|
|
greg - please call 1/2 hr prior Phone #: ###-#### talked about sub-panel, wiring bath and closets
|