Final | 11/28/2011 | 11/29/2011 | 11/29/2011 | P | PASS |
Bob Reichert
|
|
|
rulion - 1 pm Phone #: ###-#### ok final
|
ELE-Aging Inspection | 11/2/2011 | 11/2/2011 | 11/2/2011 | | DONE |
Bob Reichert
|
|
|
still under construction, no final until inside inspection done
|
ELE-Aging Inspection | 8/3/2011 | 8/3/2011 | 8/3/2011 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 4/19/2011 | 4/19/2011 | 4/21/2011 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Rough-In Permanent Service | 2/15/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### talked about grounding transformer, conductor length, pull box size, listing of building, ri ok, p/s u/g n ok
|
Electrical Rough-In | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### u/g towards transformer ok
|
Electrical Rough-In | 1/27/2011 | 1/28/2011 | 1/27/2011 | A | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### ok cover electrodes
|
Electrical Rough-In | 1/26/2011 | 1/26/2011 | 1/26/2011 | P | PASS |
Bob Reichert
|
|
|
underground//John Phone #: ###-#### corrections made, u/g ok
|
Rough-In Permanent Service | 1/24/2011 | 1/25/2011 | 1/25/2011 | A | FAIL |
Bob Reichert
|
|
|
JOHN Phone #: ###-#### met contractor, NEC 352.26 too many bends in pvc for u/g
|