Final | 4/4/2011 | 4/5/2011 | 4/5/2011 | P | PASS |
Daryl DeGrange
|
|
|
Danny Phone #: ###-#### final ok
|
Final | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | NR |
Daryl DeGrange
|
|
|
danny Phone #: ###-#### NEC.210.8(B)(2) need to finish installing GFCI receptacles
|
Electrical Rough-In | 3/18/2011 | 3/18/2011 | 3/18/2011 | P | PASS |
Daryl DeGrange
|
|
|
Danny-Ceiling only please Phone #: ###-#### rough-in ok ceiling grid
|
Electrical Rough-In | 3/6/2011 | 3/7/2011 | 3/7/2011 | A | PASS |
Bob Reichert
|
|
|
walls Phone #: ###-#### >> Inspection requested via web by danny perrine walls only ok cover
|