Final | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Jack Frank
|
|
|
Cory Phone #: ###-#### ok
|
Permanent Service | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Jack Frank
|
|
|
Cory Phone #: p/s o/h new ok
|
Rough-In Permanent Service | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PASS |
Daryl DeGrange
|
|
|
Cory Phone #: ###-#### rough-in p/s o/h n ok
|
Rough-In Permanent Service | 5/12/2011 | 5/12/2011 | 5/12/2011 | P | FAIL |
Daryl DeGrange
|
|
|
Cory-Please call at least 30 mins prior to inspection Phone #: ###-#### NEC 413.16 box fill correction still exist.
|
Electrical Rough-In | 5/3/2011 | 5/3/2011 | 5/3/2011 | P | FAIL |
Jack Frank
|
|
|
Cory Phone #: ###-#### needs to correct box fill owner used 12/3 for all wiring called
|
Electrical Rough-In | 4/18/2011 | 4/19/2011 | 4/19/2011 | A | FAIL |
Jack Frank
|
|
|
Cory Phone #: ###-#### corr. posted 300.14 grd wires cut short, needs WR recepts for outdoors, inuse cover, 3way switching for stairs
|
Conference | 3/7/2011 | 3/8/2011 | 3/9/2011 | A | DONE |
Jack Frank
|
|
|
cory Phone #: ###-####
|