Final | 6/9/2011 | 6/9/2011 | 6/9/2011 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Don Conley final ok
|
Permanent Service | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Don Conley p/s o/h rec ok
|
Electrical Rough-In | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | PASS |
Daryl DeGrange
|
|
|
rough-in ok
|
Electrical Rough-In | 3/8/2011 | 3/9/2011 | 3/9/2011 | P | FAIL |
Bob Reichert
|
|
|
Call 30 minutes before inspection. Phone #: ###-#### >> Inspection requested via web by Don Conley met contractor, left correction notice, NEC 110.26(F)(1)(b) there shall be no foreign systems in dedicated space over panel, check for attic access cable protection, rest should be ok
|