Final | 5/3/2011 | 5/4/2011 | 5/4/2011 | P | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### ok final
|
Final | 4/13/2011 | 4/14/2011 | 4/14/2011 | P | NR |
Bob Reichert
|
|
|
John please call 30 min before going out Phone #: ###-#### called for appt, not yet done, will re-schedule
|
Electrical Rough-In | 3/29/2011 | 3/30/2011 | 3/30/2011 | P | PASS |
Daryl DeGrange
|
|
|
JOHN PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-#### rough-in ok
|
Conference | 3/24/2011 | 3/25/2011 | 3/25/2011 | P | DONE |
Daryl DeGrange
|
|
|
John ###-#### discuss 1 1/4 clearance of romex from face of framing member, stapling, grounding in metal j-boxes
|