Final | 7/20/2012 | 7/23/2012 | 7/23/2012 | A | PASS |
Bob Reichert
|
|
|
COntact is Glenn Corbeil ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok final, signed card
|
Rough-In Permanent Service | 7/12/2012 | 7/13/2012 | 7/13/2012 | A | PASS |
Bob Reichert
|
|
|
Service inspection - contact is Deeon Martineau Phone #: ###-#### >> Inspection requested via web by Scott Campbell ri ok, p/s u/g n ok
|
Rough-In Permanent Service | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Bob Reichert
|
|
|
Install new riser. Please call Jim @ ###-#### w/questions. p/s o/h n ok
|
Electrical Rough-In | 7/9/2012 | 7/9/2012 | 7/9/2012 | P | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau - ceiling cover inspection Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok hall ceiling only
|
Electrical Rough-In | 5/3/2012 | 5/4/2012 | 5/4/2012 | A | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau Phone #: ###-#### >> Inspection requested via web by Scott Campbell ri ok anop, chemical building
|
Electrical Rough-In | 3/15/2012 | 3/15/2012 | 3/15/2012 | P | PASS |
Bob Reichert
|
|
|
Ceiling cover inspection. Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover hall ceiling
|
Electrical Rough-In | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Bob Reichert
|
|
|
Ceiling Cover Inspection. Jobsite contact is Deeon Martineau ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover TEMS lab ceiling and north corridor ceiling, signed t/o card
|
Electrical Rough-In | 3/1/2012 | 3/1/2012 | 3/1/2012 | P | CANC |
Doug A Poedy
|
|
|
Ceiling Cover Inspection. Jobsite contact is Deeon Martineau ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell. Rescheduled
|
Electrical Rough-In | 2/24/2012 | 2/27/2012 | 2/27/2012 | A | PASS |
Bob Reichert
|
|
|
Job contact is Glen Corbeil ###-####. Rough-in inspection for East stairwell. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover stairwell
|
Electrical Rough-In | 2/24/2012 | 2/24/2012 | 2/24/2012 | P | CANC |
Doug A Poedy
|
|
|
Job contact is Glen Corbeil ###-####. Rough-in inspection for East stairwell. Phone #: ###-#### >> Inspection requested via web by Scott Campbell. Rescheduled.
|
Final | 2/13/2012 | 2/15/2012 | 2/16/2012 | A | PART |
Bob Reichert
|
|
|
Note: This is a final inspection for Stage One area only. Job site contact is Glen Corbeil ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell shall strap conduit, provide work space about equipment, there shall be no foreign systems or ducts or pipes in dedicated space, shall provide approved labels and or listings for equipment
|
Final | 2/13/2012 | 2/14/2012 | 2/13/2012 | A | CANC |
Bob Reichert
|
|
|
Please note - this is a final for the Phase One area only. Contact onsite is Glen Corbeil ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell Inspection cancelled from web by: Scott Campbell
|
Conference | 1/30/2012 | 1/31/2012 | 1/31/2012 | A | DONE |
Bob Reichert
|
|
|
Request from Deeon Martineau for on-site conference Tuesday morning to look at a clearance issue. His cell is ###-####. Thanks, Phone #: ###-#### >> Inspection requested via web by Scott Campbell talked about panel clearance for 480v panel
|
Electrical Rough-In | 1/23/2012 | 1/24/2012 | 1/24/2012 | A | PASS |
Bob Reichert
|
|
|
Wall rough-in inspection - contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell south east stairwell ok cover
|
Electrical Rough-In | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau ###-####- wall rough-in inspection. Phone #: ###-#### >> Inspection requested via web by Scott Campbell walls ok anop
|
Rough-In Permanent Service | 12/1/2011 | 12/2/2011 | 12/2/2011 | A | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau-he states that this will be a long inspection tomorrow, just a heads up Phone #: ###-#### >> Inspection requested via web by Scott Campbell ri ok anop, ok p/s for power as needed
|
Electrical Rough-In | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau Phone #: ###-#### >> Inspection requested via web by Scott Campbell stairwell anop ok cover
|
Electrical Rough-In | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Bob Reichert
|
|
|
Wall rough-in inspection. Contact is Deeon Martineau ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover walls anop
|
Rough-In Permanent Service | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | PART |
Bob Reichert
|
|
|
Job site contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell check on pull box sizing, open ko's, securing raceways, ok for power as needed for 300 kva transformers, shall move foreign piping in dedicated space over vfd area, will sign prints
|
Electrical Rough-In | 10/31/2011 | 11/1/2011 | 11/1/2011 | A | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell walls ok anop
|
Electrical Rough-In | 10/20/2011 | 10/21/2011 | 10/21/2011 | A | PASS |
Bob Reichert
|
|
|
Wall rough-in inspection. Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell wall ok anop
|
Electrical Rough-In | 10/19/2011 | 10/20/2011 | 10/20/2011 | A | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover walls anop
|
Electrical Rough-In | 10/14/2011 | 10/17/2011 | 10/17/2011 | P | PASS |
Bob Reichert
|
|
|
Wall rough-in inspection for Monday afternoon. Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover walls anop
|
Electrical Rough-In | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | PASS |
Bob Reichert
|
|
|
Wall rough in inspection - contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell walls ok anop
|
Electrical Rough-In | 9/13/2011 | 9/14/2011 | 9/14/2011 | A | PART |
Bob Reichert
|
|
|
Wall rough in inspection. Job site contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell walls only anop, same comments for Power Plus
|
Electrical Rough-In | 8/29/2011 | 8/29/2011 | 8/29/2011 | P | PASS |
Bob Reichert
|
|
|
Contact is Deeon Martineau ###-#### - cover inspection. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover u/g for hv supply, east side
|
Electrical Rough-In | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Bob Reichert
|
|
|
cover inspection for 5" PVC duct contact is Deeon Martineau Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover u/g east side for incoming power at building, should see u/g to vaults later going north
|
Electrical Rough-In | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PASS |
Bob Reichert
|
|
|
please inspect PVC conduit so we can backfill the area on the East side of Bldg 50. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok backfill underground east side
|
Electrical Rough-In | 7/22/2011 | 7/22/2011 | 7/22/2011 | P | PART |
Bob Reichert
|
|
|
Grounding and Rough-in inspection - Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell 2nd u/g lift ok to pour
|
Electrical Rough-In | 7/18/2011 | 7/19/2011 | 7/19/2011 | A | PASS |
Bob Reichert
|
|
|
Underground rough-in inspection - contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell looked at u/g for concrete pour, first set of lower conduits, 1st lift
|
Electrical Rough-In | 7/13/2011 | 7/14/2011 | 7/14/2011 | A | PART |
Bob Reichert
|
|
|
Underground cover inspection. Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell 1st lift u/g east end ok to cover
|
Electrical Rough-In | 5/12/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Bob Reichert
|
|
|
Underground inspection-contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell u/g ok anop
|
Electrical Rough-In | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PART |
Bob Reichert
|
|
|
Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover se part floor anop
|
Electrical Rough-In | 4/27/2011 | 4/28/2011 | 4/28/2011 | A | PASS |
Bob Reichert
|
|
|
Cover inspection - Contact is Deeon Martineau at ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell u/g ok anop
|
Electrical Rough-In | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | PART |
Bob Reichert
|
|
|
Underground rough-in inspection. Contact is Deeon Martineau ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Campbell u/g ok anop
|
Electrical Rough-In | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PART |
Bob Reichert
|
|
|
Cover Inspection - Job contact is Deeon Martineau Phone #: ###-#### >> Inspection requested via web by Scott Campbell u/g ok anop
|
Electrical Rough-In | 3/31/2011 | 3/31/2011 | 3/31/2011 | P | PASS |
Daryl DeGrange
|
|
|
dion Phone #: ###-#### rough-in ok cover underground
|