Final | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Idsinga final ok
|
Final | 6/21/2011 | 6/21/2011 | 6/21/2011 | P | NR |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Greg Idsinga NEC 210.8(2) All 15 and 20 ampere 125 volt receptacles in nondwelling-type kitchens to be GFCI protected. No power in bathroom receptacles.
|
Final | 6/19/2011 | 6/20/2011 | 6/20/2011 | P | NR |
Bob Reichert
|
|
|
call for questions and comments. Phone #: ###-#### >> Inspection requested via web by Greg Idsinga called, shall finish all panel schedules, shall install gfci and secure receptacle by janitor closet panel, shall close openings in panels, shall strap emt,shall provide workspace about panel, shall relocate pipe over panel, shall delete wiring at abandoned panel and provide breaker space closure, shall provide nailplates and protect mc cable in basement wal,l rest ok, told general address shall be posted
|
Electrical Rough-In | 5/25/2011 | 5/25/2011 | 5/25/2011 | P | PASS |
Daryl DeGrange
|
|
|
grid insp//Greg Phone #: ###-####
|
Electrical Rough-In | 5/25/2011 | 5/25/2011 | 5/25/2011 | A | NH |
Daryl DeGrange
|
|
|
We just need the lid inspected so we can put the tiles in. Thank you, Greg Phone #: ###-#### >> Inspection requested via web by Greg Idsinga
|
Electrical Rough-In | 4/8/2011 | 4/8/2011 | 4/8/2011 | P | PASS |
Daryl DeGrange
|
|
|
Greg Phone #: ###-#### rough-in main floor and basement
|