Final | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Daryl DeGrange
|
|
|
Early morning if possible Phone #: ###-#### >> Inspection requested via web by Zane Robertson final ok
|
Final | 7/20/2011 | 7/20/2011 | 7/20/2011 | P | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson NEC 210.52(2)(1) Receptacle spacing ,Any wall space over 2 foot requires an receptacle. Upstairs 1st bedroom. Mud room lighting not working. A/C unit--1/2 seal tight flex-1 in strapes
|
Rough-In Permanent Service | 3/30/2011 | 3/31/2011 | 3/30/2011 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Zane Robertson rough-in p/s u/g n ok
|