Final | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by mike brown final ok
|
Electrical Rough-In | 4/2/2012 | 4/2/2012 | 4/2/2012 | A | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover trench, conduits for future gate
|
Electrical Rough-In | 2/3/2012 | 2/3/2012 | 2/3/2012 | P | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover floor heat master bathroom
|
Electrical Rough-In | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Daryl DeGrange
|
|
|
potting insp on pool and spa lights.
thanks rough-in ok UL listed wet niche luminaires
Mike Cole B&B Phone #: ###-#### >> Inspection requested via web by Eric Brown
|
Electrical Rough-In | 11/18/2011 | 11/18/2011 | 11/18/2011 | P | PASS |
Bob Reichert
|
|
|
pool trench inspection Mike Brown ###-#### Phone #: ###-#### >> Inspection requested via web by mike brown ok cover u/g for pool area
|
Electrical Rough-In | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | PASS |
Daryl DeGrange
|
|
|
pool bonding 2 lights and main bond from pool room only, no ladders or hand rails Phone #: ###-#### >> Inspection requested via web by mike brown rough-in ok cover pool bonding
|
Electrical Rough-In | 6/15/2011 | 6/16/2011 | 6/15/2011 | A | CANC |
Daryl DeGrange
|
|
|
Trench inspection please-Michael Phone #: ###-#### rough-in ok cover trench
|
Rough-In Permanent Service | 4/25/2011 | 4/25/2011 | 4/25/2011 | P | PASS |
Daryl DeGrange
|
|
|
call mike with approx time please!!! Phone #: ###-#### >> Inspection requested via web by mike brown rough-in p/s u/g n ok
|
Conference | 4/11/2011 | 4/13/2011 | 4/13/2011 | A | DONE |
Daryl DeGrange
|
|
|
Go over lighting in soffits before cover Phone #: ###-#### >> Inspection requested via web by mike brown dicussed with electrical contractor lighting fixtures in cover soffits areas- service grounding
|