Permanent Service | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PASS |
Jack Frank
|
|
|
p/s u/g rec. ok all 3 meters
|
Final | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PASS |
Jack Frank
|
|
|
|
Electrical Rough-In | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PASS |
Jack Frank
|
|
|
Idaho power will disconnect power at 9:oo am. If you could be there about 10:00 am and do the rough-in and we will procede with the work. Give me a call if you have any questions or this time wont work for you. Phone #: ###-#### >> Inspection requested via web by jody mitchell
|
Electrical Rough-In | 4/21/2011 | 4/21/2011 | 4/21/2011 | P | FAIL |
Jack Frank
|
|
|
###-#### check size of gutter, bonding ,grding, called
|
Final | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | NR |
Jack Frank
|
|
|
Please call Dave Beck at ###-#### to get in the building Phone #: ###-#### >> Inspection requested via web by jody mitchell called explained BCC policyfor request, and access
|