Final | 11/1/2011 | 11/2/2011 | 11/2/2011 | A | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Mark M final ok
|
Electrical Rough-In | 10/12/2011 | 10/13/2011 | 10/12/2011 | A | PASS |
Daryl DeGrange
|
|
|
Call Rene @ ###-#### or ###-#### Phone #: ###-#### >> Inspection requested via web by Scott Lee rough-in ok cover ceiling by-plane area
|
Electrical Rough-In | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Daryl DeGrange
|
|
|
desk ###-#### cell ###-#### Phone #: ###-#### >> Inspection requested via web by Mark M rough-in ok cover walls only
|
Electrical Rough-In | 5/25/2011 | 5/26/2011 | 5/26/2011 | A | PASS |
Daryl DeGrange
|
|
|
Main hospital entrance Phone #: ###-#### >> Inspection requested via web by Mark M rough-in ok cover ceiling grid
|
Electrical Rough-In | 5/2/2011 | 5/2/2011 | 5/2/2011 | A | PASS |
Daryl DeGrange
|
|
|
MARK Phone #: ###-#### rough-in ok sm office space 1 st floor
|