Final | 5/13/2011 | 5/16/2011 | 5/16/2011 | P | PASS |
Bob Reichert
|
|
|
final for lighting alteration. Install highbays in shop area, retrofit t12 to t8 lobby area Phone #: ###-#### >> Inspection requested via web by Tim Dunlop called, ok final, told to call for ri next time
|