ELE-Aging Inspection | 2/23/2012 | 2/23/2012 | 2/29/2012 | | DONE |
Bob Reichert
|
|
|
see final
|
Final | 2/29/2012 | 2/29/2012 | 2/29/2012 | A | PASS |
Bob Reichert
|
|
|
ok final
|
Permanent Service | 5/11/2011 | 5/11/2011 | 5/11/2011 | P | PASS |
Bob Reichert
|
|
|
The inspector is wanting the see all the meters marked, is is ready for an inspection, thx, TW. Phone #: ###-#### >> Inspection requested via web by Stephen Kren p/s o/h rec ok
|
Permanent Service | 5/10/2011 | 5/11/2011 | 5/11/2011 | A | CANC |
Bob Reichert
|
|
|
Doug D. has requested to see a permanent platform installed, it is ready for an inspection, any questions please let me know, thx, Terry W. Phone #: ###-#### >> Inspection requested via web by Stephen Kren Inspection cancelled from web by: Stephen Kren
|
Permanent Service | 5/10/2011 | 5/10/2011 | 5/10/2011 | P | CANC |
Bob Reichert
|
|
|
Doug D. wanted to see a permanent raised platform, it is in and ready for inspection, thx, Terry W. Phone #: ###-#### >> Inspection requested via web by Stephen Kren Inspection cancelled from web by: Stephen Kren
|
Permanent Service | 5/5/2011 | 5/6/2011 | 5/6/2011 | P | FAIL |
Doug A Poedy
|
|
|
Doug Poedy and the owner met at the jobsite, all the items that Doug instructed the builder to do are ready for an inspection. Please give me a call before heading that way I I will insure the neighboring tenant will have it unlocked, thanks, TW. Phone #: ###-#### >> Inspection requested via web by Stephen Kren. Needs to pour concrete for height adjustment.
|