Final | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Bob Reichert
|
|
|
Tyrel Phone #: ###-#### corrections made, ok final
|
Final | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | CANC |
Bob Reichert
|
|
|
|
Permanent Service | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | PASS |
Bob Reichert
|
|
|
Mitch PLEASE CALL 30 MIN BEFORE GOING OUT Phone #: ###-#### p/s o/h n ok, called contractor, this is conditional before final that equipment is braced for available fault current, conduit is strapped, ground bar is installed in ice box panel
|
Conference | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | DONE |
Bob Reichert
|
|
|
talked about service, feeding ice machine, bringing sno-shack up to code, told contractor we would not need access to shack until final
|
Permanent Service | 5/17/2011 | 5/18/2011 | 5/18/2011 | A | FAIL |
Bob Reichert
|
|
|
blake Phone #: ###-#### called, left message, left correction notice, BCC 4-05-33)A),(B) all equipment shall be listed by a nationally recognized testing lab, shall affix job id sticker, riser shall be minimum 2", NEC 250.56 shall install 2 ground rods, 312.5 all conductors entering enclosure shall have abrasion protection, 200.7 shall not use white wire for phase conductor, 400.8 so cord shall not be used as a substitute for fixed wiring for structure, 250.32(B) shall carry ground to separate structure disconnect
|