Final | 2/8/2012 | 2/8/2012 | 2/8/2012 | P | PASS |
Doug A Poedy
|
|
|
Please call Troy with any questions. Phone #: ###-#### >> Inspection requested via web by Mark Sessions. Poles are now listed.
|
Electrical Rough-In | 6/2/2011 | 6/2/2011 | 6/2/2011 | A | PASS |
Doug A Poedy
|
|
|
CSA is working on listing these solar light poles. Do not final until it is completed. Met with contractor and Inovus solar and fired up poles. Took mutiple voltage measurements and checked ground. All seemed good.
|
Conference | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | DONE |
Daryl DeGrange
|
|
|
call before//Rob Starr Phone #: ###-#### Solar photovoltaic pole lighting fixtures
|