Final | 10/11/2011 | 10/13/2011 | 10/13/2011 | A | PASS |
Bob Reichert
|
|
|
Calvin Phone #: ###-#### ok final
|
Electrical Rough-In | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Bob Reichert
|
|
|
cable heat-tile floor--Calvin Phone #: ###-#### ok cover floor heat
|
Electrical Rough-In | 5/18/2011 | 5/19/2011 | 5/19/2011 | A | PART |
Bob Reichert
|
|
|
Calvin Phone #: ###-#### ri ok, need to see boxes for cabinet
|