Final | 8/3/2011 | 8/3/2011 | 8/3/2011 | P | PASS |
Bob Reichert
|
|
|
this floor is ready for a final. We are on site today working on the 3rd floor. call steve at ###-#### and he will walk you thru the 4th floor work for a final Phone #: ###-#### >> Inspection requested via web by Don Lustig ok final, signed card
|
Electrical Rough-In | 6/21/2011 | 6/22/2011 | 6/22/2011 | A | PASS |
Bob Reichert
|
|
|
single wall cover needed should be unlocked Phone #: ###-#### >> Inspection requested via web by Don Lustig wall only ok cover, see ceiling later
|