Final | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Daryl DeGrange
|
|
|
Call corey at above number with any questions Phone #: ###-#### >> Inspection requested via web by Don Lustig final ok
|
Electrical Rough-In | 8/28/2011 | 8/29/2011 | 8/29/2011 | A | PASS |
Bob Reichert
|
|
|
we are now ready for ceiling cover Phone #: ###-#### >> Inspection requested via web by Don Lustig corrections made ok cover ceiling
|
Electrical Rough-In | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | FAIL |
Bob Reichert
|
|
|
ceiling cover is ready call with questions of concerns to corey''s number above or call me don @ ###-#### Phone #: ###-#### >> Inspection requested via web by Don Lustig called, shall strap conduit, close boxes, remove unused lv cable or tag as purpose
|
Electrical Rough-In | 8/4/2011 | 8/4/2011 | 8/4/2011 | P | PASS |
Bob Reichert
|
|
|
3rd floor wall rough in Phone #: ###-#### >> Inspection requested via web by Don Lustig ri ok
|