Final | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | PASS |
Daryl DeGrange
|
|
|
Final inspection please. Contact is Bob Callahan. Thank you and have a great day. Phone #: ###-#### >> Inspection requested via web by Laura Longshaw final ok
|
Electrical Rough-In | 6/2/2011 | 6/3/2011 | 6/3/2011 | A | PASS |
Daryl DeGrange
|
|
|
Could we please get this first thing in the morning. Rough in inspection please. Bob Callahan is the contact. Thank you. Phone #: ###-#### >> Inspection requested via web by Laura Longshaw rough-in ok unattached building (mancave)
|
Electrical Rough-In | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | NR |
Daryl DeGrange
|
|
|
Rough in please. Contact if Bob Callahan. Thank you. Phone #: ###-#### >> Inspection requested via web by Laura Longshaw
|