Final | 3/9/2012 | 3/9/2012 | 3/9/2012 | A | PASS |
Jack Frank
|
|
|
check on service for final
|
ELE-Aging Inspection | 3/9/2012 | 3/9/2012 | 3/9/2012 | | DONE |
Jack Frank
|
|
|
|
Permanent Service | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PASS |
Bob Reichert
|
|
|
Craig Phone #: ###-#### corrections made, p/s o/h n ok
|
Permanent Service | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | FAIL |
Bob Reichert
|
|
|
Kenny Phone #: ###-#### corrections not made, called and told to fix before inspection
|
Permanent Service | 6/7/2011 | 6/8/2011 | 6/8/2011 | A | FAIL |
Bob Reichert
|
|
|
Kenny ###-#### called, told to provide bond bushing for nipple in meter, told that all disconnects and spaces shall have permanent identification, can't find where load end of service is. Tenant supposed to be at NE end of building, but they say electrical in welding shop. The power is supposed to be for equipment on east side of building, but it needs serviced.
|