Final | 6/24/2011 | 6/24/2011 | 6/24/2011 | P | PASS |
Doug A Poedy
|
|
|
Panel schedules done, and ko seal installed.
|
Final | 6/23/2011 | 6/23/2011 | 6/23/2011 | P | FAIL |
Bob Reichert
|
|
|
please final Phone #: ###-#### >> Inspection requested via web by David Mackey called, told to clean up panel schedules, strap mc cable, plug openings in boxes
|
Electrical Rough-In | 6/22/2011 | 6/22/2011 | 6/22/2011 | P | NR |
Bob Reichert
|
|
|
Please final with no defects Phone #: ###-#### >> Inspection requested via web by David Mackey still connecting furniture, told to call when ready
|
Conference | 6/20/2011 | 6/20/2011 | 6/20/2011 | P | DONE |
Doug A Poedy
|
|
|
|