Final | 4/5/2012 | 4/9/2012 | 4/9/2012 | A | PASS |
Daryl DeGrange
|
|
|
final inspection on restroom. need to call me beforehand. -- building is locked up. Monday 4/9/12 at 9:00AM will work for me. Let me know Thanks Kevin Koomler Phone #: ###-#### >> Inspection requested via web by Kevin Koomler final ok
|
ELE-Aging Inspection | 3/14/2012 | 3/14/2012 | 3/14/2012 | | PASS |
Daryl DeGrange
|
|
|
still under construction
|
Electrical Rough-In | 10/18/2011 | 10/19/2011 | 10/19/2011 | A | PASS |
Daryl DeGrange
|
|
|
rough-in cover for furred bath walls Phone #: ###-#### >> Inspection requested via web by Kevin Koomler rough-in ok cover new furred-out walls in bathrooms
|
Final | 10/10/2011 | 10/11/2011 | 10/11/2011 | P | NR |
Daryl DeGrange
|
|
|
Kevin Phone #: ###-#### wrong request for inspection
|
Electrical Rough-In | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Daryl DeGrange
|
|
|
rough-in ok cover interior walls
|
Temporary Service | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | PASS |
Daryl DeGrange
|
|
|
kevin Phone #: ###-#### t/s u/g at service ok
|
Electrical Rough-In | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PASS |
Daryl DeGrange
|
|
|
kevin - u/g cover Phone #: ###-#### rough-in ok cover under slab floor
|
Electrical Rough-In | 6/21/2011 | 6/22/2011 | 6/22/2011 | A | PASS |
Daryl DeGrange
|
|
|
inspection for Ufer Ground Phone #: ###-#### >> Inspection requested via web by Kevin Koomler rough-in ok cover ufer
|