Final | 8/9/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Daryl DeGrange
|
|
|
Final inspection. Contact name is CJ. Thanks Phone #: ###-#### >> Inspection requested via web by Chris Chesnut final ok
|
Permanent Service | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | PASS |
Daryl DeGrange
|
|
|
Panel inspection. CJ is contact. Thank you Phone #: ###-#### >> Inspection requested via web by Chris Chesnut p/s u/g rec meter pac
|
Electrical Rough-In | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Doug A Poedy
|
|
|
Just rough-in inspection. CJ is contact. Thank you Phone #: ###-#### >> Inspection requested via web by Chris Chesnut
|
Rough-In Permanent Service | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | CANC |
Daryl DeGrange
|
|
|
Partial rough-in. Thank you. Contact name is CJ. Phone #: ###-#### >> Inspection requested via web by Chris Chesnut partial rough-in ok east wall only NO permanent service
|
Electrical Rough-In | 6/30/2011 | 7/1/2011 | 6/30/2011 | A | PASS |
Daryl DeGrange
|
|
|
underground inspection. Ran about 20 ft. of conduit, concrete was saw cut. Thanks. Contact is CJ Phone #: ###-#### >> Inspection requested via web by Chris Chesnut rough-in ok cover trench
|