Final | 6/28/2011 | 6/28/2011 | 6/28/2011 | P | PASS |
Bob Reichert
|
|
|
Service change only. Expect our work to be complete by noon. Phone #: ###-#### >> Inspection requested via web by Paula Gratiot p/s o/h rec ok--conditional only,contractor shall call for final by 7/5/11 or possibly have meter pulled, shall check for 2" mast, clearance below panel, sub-panel, water pipe and 2 ground rods, emt connectors shall be weaher proof
|