Final | 10/14/2011 | 10/17/2011 | 10/17/2011 | A | PASS |
Jack Frank
|
|
|
Gary Phone #: ###-#### ok card signed
|
Final | 9/20/2011 | 9/21/2011 | 9/21/2011 | A | FAIL |
Jack Frank
|
|
|
FRANK Phone #: ###-#### called use only manufactures breakers, complete all trimout, use adadapt rings where required, provide panel schedule, test all recepts for gfci protection where required , adjust deadfront of panel so there is no gap between it and breakers
|
Electrical Rough-In | 8/5/2011 | 8/8/2011 | 8/8/2011 | A | PASS |
Jack Frank
|
|
|
frank Phone #: ###-#### ok
|
Electrical Rough-In | 8/5/2011 | 8/5/2011 | 8/5/2011 | P | FAIL |
Bob Reichert
|
|
|
frank Phone #: ###-#### corrections not made, fee due
|
Electrical Rough-In | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | FAIL |
Bob Reichert
|
|
|
Frank Phone #: ###-#### met contractor, grounding not done, make-up not done, nail plates not done, open knock-out not closed, boxes not mounted, told to call when ready
|
Electrical Rough-In | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | NR |
Bob Reichert
|
|
|
frank Phone #: ###-#### met contractor, too many items for correction notice, shall add 1 1/4" protection for holes and cable, add ground screws, make-up, close open ko, mount boxes, clean-up basement panels, add extension rings, set screw, will call for another inspection
|
Electrical Rough-In | 7/18/2011 | 7/19/2011 | 7/18/2011 | P | CANC |
Jack Frank
|
|
|
Franklin Phone #: ###-#### -- cancelled per Frank Luna 7/18/11 1:50pm.
|
Electrical Rough-In | 7/13/2011 | 7/14/2011 | 7/14/2011 | P | FAIL |
Jack Frank
|
|
|
Frank Luna Phone #: ###-#### called left message needs nailplates and 11/4"strap MC 12" of boxes 90degree fitting on EMT, need approved plans at site for energy and conservation code requirements for switching and lighting
|