Final | 6/21/2012 | 6/21/2012 | 6/21/2012 | P | PASS |
Bob Reichert
|
|
|
Contact Kelly Tarter @ ###-#### Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson ok final
|
ELE-Aging Inspection | 6/19/2012 | 6/19/2012 | 6/21/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
ELE-Aging Inspection | 3/20/2012 | 3/20/2012 | 3/21/2012 | | DONE |
Bob Reichert
|
|
|
still under construction
|
Conference | 11/2/2011 | 11/2/2011 | 11/2/2011 | A | DONE |
Bob Reichert
|
|
|
talked to contractor, and 414 about lighting and fixture mounting to boxes, don't see code violation, contractor will try to solve issues with and via general contractor, may need conference later, contact is KELLY ###-####
|
Final | 10/21/2011 | 10/21/2011 | 10/21/2011 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson ok final
|
Final | 10/19/2011 | 10/20/2011 | 10/20/2011 | A | CANC |
Bob Reichert
|
|
|
Contact Kelly Tarter 30mins prior to inspection Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson called, contractor asked to cancel, had not done panel schedule, will recall when done
|
Final | 10/14/2011 | 10/17/2011 | 10/17/2011 | A | CANC |
Bob Reichert
|
|
|
Kelly Tarter Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson see p/s, shall call for final when done
|
Permanent Service | 10/17/2011 | 10/17/2011 | 10/17/2011 | A | PASS |
Bob Reichert
|
|
|
corrections made, p/s u/g n ok, shall call for final when done
|
Conference | 10/13/2011 | 10/13/2011 | 10/13/2011 | P | DONE |
Bob Reichert
|
|
|
talked about service
|
Permanent Service | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | FAIL |
Bob Reichert
|
|
|
Service Disconnect sticker has been installed. Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson called, left correction notice, NEC 230.66 equipment shall be marked to identify it as being suitable for use as service equipment, 110.12(A) shall close front opening, 408.38 enclosure shall be dead front
|
Permanent Service | 10/4/2011 | 10/5/2011 | 10/5/2011 | A | FAIL |
Bob Reichert
|
|
|
Permanent service inspection Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson called, told contractor to re-call when inspector can find service entrance listing on panel
|
Electrical Rough-In | 9/22/2011 | 9/22/2011 | 9/22/2011 | P | PASS |
Daryl DeGrange
|
|
|
Underground inspection. Call Kelly @ ###-####, 30 mins prior to inspection. Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson rough-in ok cover underground, verified depth
|
Rough-In Permanent Service | 9/20/2011 | 9/21/2011 | 9/21/2011 | A | NR |
Daryl DeGrange
|
|
|
Call Kelly @ ###-####, 30 minutes prior to inspection. Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson Need to have trench opened to exspose depth on 2in conduit in at least 3 locations
|
Rough-In Permanent Service | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | FAIL |
Bob Reichert
|
|
|
Please call Kelly 30mins prior to inspection to meet the inspector on the job site. Phone #: ###-#### >> Inspection requested via web by Kristopher Wilson called, left correction notice, NEC 250.24 shqall provide system grounding, 250.52(A) shall provide electrodes for grounding, 250.56 shall provide 2 electrodes 6' apart, 250.92 shall provide bond bushings, BCC shall provide equipment prior to inspection- service disconnect, shall not cover u/g prior to inspection
|