Temporary Service | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Rohl corrections made, t/s u/g n ok
|
Temporary Service | 7/22/2011 | 7/25/2011 | 7/25/2011 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Rohl called left message, , left correction notice, NEC 110.14(A) shall connect neutral conductor in meter socket, 250.24(A) grounding electrode conductor shall be connected to grounded service conductor terminal
|
Temporary Service | 7/21/2011 | 7/21/2011 | 7/21/2011 | P | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### >> Inspection requested via web by Dan Rohl called contractor, pole not set, will recall
|