Permanent Service | 7/26/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Jack Frank
|
|
|
george Phone #: ###-#### p/s o/h rec. ok
|
Final | 7/26/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Jack Frank
|
|
|
george Phone #: ###-#### ok
|
Final | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | FAIL |
Jack Frank
|
|
|
george Phone #: ###-#### called remove old GEC to water so there is no parallel path, needs 2 rigid or IMC for mast, note if rigid nipple used make sure you use 4 locknuts, also request p/s not final
|