Final | 8/23/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Daryl DeGrange
|
|
|
final inspection also Phone #: ###-#### >> Inspection requested via web by Don Lustig final ok
|
Electrical Rough-In | 8/23/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Daryl DeGrange
|
|
|
ceiling cover Phone #: ###-#### >> Inspection requested via web by Don Lustig rough-in ok cover ceiling grid
|
Electrical Rough-In | 8/19/2011 | 8/19/2011 | 8/19/2011 | P | NR |
Bob Reichert
|
|
|
ready for ceiling cover Phone #: ###-#### >> Inspection requested via web by Don Lustig shall finishh work,provide independent support wires for boxes, remove abandoned lv wiring, provide ko seals, covers
|
Electrical Rough-In | 7/27/2011 | 7/28/2011 | 7/28/2011 | A | PASS |
Daryl DeGrange
|
|
|
ready for wall cover call corey with questionss Phone #: ###-#### >> Inspection requested via web by Don Lustig rough-in ok cover walls
|