Final | 10/31/2011 | 10/31/2011 | 10/31/2011 | P | PASS |
Bob Reichert
|
|
|
Dave Phone #: ###-#### corrections made, ok final
|
Final | 10/27/2011 | 10/28/2011 | 10/28/2011 | A | FAIL |
Bob Reichert
|
|
|
Dave Phone #: ###-#### called, left message, shall install switch plate, gfci shall operate down bath, north room down, afci
|
Electrical Rough-In | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | PASS |
Bob Reichert
|
|
|
Dave Phone #: ###-#### corrections made, ri ok
|
Electrical Rough-In | 8/19/2011 | 8/22/2011 | 8/22/2011 | P | FAIL |
Bob Reichert
|
|
|
Tom McGraw Phone #: ###-#### called, electrical contractor did not call for inspection, not ready, needs nail plates, free conductor length, ground metal boxes, outlet spacing, stapling
|