Final | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | PASS |
Bob Reichert
|
|
|
Final and Cover Inspection Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen corrections made, ok final, signed card
|
Final | 8/22/2011 | 8/23/2011 | 8/23/2011 | P | PART |
Bob Reichert
|
|
|
ceiling inspection / final Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen ceiling covered, looked at some after contractor pulled some tiles, shall cover boxes, install seismic wires, not support cable fron conduit, told to leave tiles out after they make corrections and re-call for inspection-- back room receptacles ok, need to put on panel schedule, need to check front area
|
Electrical Rough-In | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PASS |
Jack Frank
|
|
|
rough - wall cover Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen
|
Electrical Rough-In | 8/16/2011 | 8/17/2011 | 8/17/2011 | A | PASS |
Bob Reichert
|
|
|
rough/conference Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen ok to cover u/g only
|