Final | 8/31/2011 | 9/1/2011 | 9/1/2011 | P | PASS |
Daryl DeGrange
|
|
|
luke - please call 1/2 hr prior - around 3 if possible Phone #: ###-#### final ok
|
Electrical Rough-In | 8/29/2011 | 8/30/2011 | 8/30/2011 | P | PASS |
Daryl DeGrange
|
|
|
luke Phone #: ###-#### rough-in ok cover trench for hot tub/ service receptacle relocate
|
Conference | 8/17/2011 | 8/19/2011 | 8/19/2011 | P | DONE |
Bob Reichert
|
|
|
call 15 min prior//Luke ###-#### talked about hook-up for hot tub, move existing away from tub, tub is listed
|