Final | 10/13/2011 | 10/13/2011 | 10/13/2011 | P | PASS |
Bob Reichert
|
|
|
Please call 30min prior---Warren Phone #: ###-#### ok final, signed card
|
Conference | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | DONE |
Bob Reichert
|
|
|
warren Phone #: ###-#### reviewed wiring requirements for tanning beds and labelling
|
Final | 9/30/2011 | 10/3/2011 | 10/3/2011 | P | NR |
Bob Reichert
|
|
|
warren - ceiling Phone #: ###-#### called, plates not on, equipment not installed
|
Electrical Rough-In | 9/30/2011 | 10/3/2011 | 10/3/2011 | P | NR |
Bob Reichert
|
|
|
warren - ceiling Phone #: ###-#### called, told that tiles shall be removed, seismic wires installed, lv removed, ceiling shall not support wiring, strap flex, shall not be on grid
|
Electrical Rough-In | 9/15/2011 | 9/16/2011 | 9/16/2011 | A | PASS |
Bob Reichert
|
|
|
Warren Phone #: ###-#### corrections made, ri ok walls only
|
Electrical Rough-In | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | FAIL |
Bob Reichert
|
|
|
Warren Phone #: ###-#### called, left correction notice, shall strap mc cable, emt, shall provide 1 1/4" for mc cable protection from edge of framing members, shall install ground screws in metal box, shall install mud ring
|