Final | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Daryl DeGrange
|
|
|
ETL Listed hot tub final ok
|
Electrical Rough-In | 10/11/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Daryl DeGrange
|
|
|
steve Phone #: ###-#### rough-in ok cover trench
|
Conference | 9/26/2011 | 9/26/2011 | 9/26/2011 | P | PASS |
Daryl DeGrange
|
|
|
Steve Phone #: ###-#### met with owner, discussed electrical requirements for hot tub. GFCI and over current protection,Max. of 360 degrees in conduit run.service outlet
|