Final | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Bob Reichert
|
|
|
TIM Phone #: ###-#### ok final
|
Electrical Rough-In | 10/11/2011 | 10/11/2011 | 10/11/2011 | P | PASS |
Bob Reichert
|
|
|
Kim Phone #: ###-#### p/s o/h rec ok
|
Conference | 9/29/2011 | 9/29/2011 | 9/29/2011 | P | DONE |
Daryl DeGrange
|
|
|
Talked with electrical contractor about service location,grounding,bonding to incoming metal water line,range and dryer branch circuits.
|