Final | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | PASS |
Rock A. Hudson
|
|
|
Original inspection onservice change should have been finalled at that time.
|
ELE-Aging Inspection | 11/16/2012 | 11/16/2012 | 11/19/2012 | | DONE |
Rock A. Hudson
|
|
|
should have been finalled at the time of service change
|
Final | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | PASS |
Rock A. Hudson
|
|
|
Hot tub final ok
|
ELE-Aging Inspection | 6/13/2012 | 6/13/2012 | 6/13/2012 | | CANC |
Daryl DeGrange
|
|
|
Elect. contractor will call for final
|
Permanent Service | 10/4/2011 | 10/5/2011 | 10/5/2011 | P | PASS |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Larry Richardson p/s o/h n ok
|
Permanent Service | 10/4/2011 | 10/5/2011 | 10/4/2011 | A | FAIL |
Daryl DeGrange
|
|
|
New 200 A service on Garage- Will disconnect from house when power is attached to new service-then run branch circuit into garage Phone #: ###-#### >> Inspection requested via web by Larry Richardson NEC 250.64(E) Shall use metallic connector listed for grounding & bonding where grounding electrode conductor enters service or use non-metallic connector
|