Final | 12/23/2011 | 12/23/2011 | 12/23/2011 | P | PASS |
Daryl DeGrange
|
|
|
CHad Phone #: ###-#### final ok corrections done
|
Final | 12/20/2011 | 12/21/2011 | 12/21/2011 | A | FAIL |
Jack Frank
|
|
|
Chad Phone #: ###-####needs proper size boxes for island recepts, remove under counter lights from SABC, also ele.contr shall secure permit for floor heat, test it and accept full responsibility for it. note it was installed by tile contractor , and with no inspections
|
Electrical Rough-In | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PASS |
Jack Frank
|
|
|
chad Phone #: ###-#### ok kit. and M bath
|