Final | 11/17/2011 | 11/18/2011 | 11/18/2011 | A | FAIL |
Bob Reichert
|
|
|
this inspection is for a requested inspection on the service for idaho power co hook up Phone #: ###-#### >> Inspection requested via web by Dan Hobdey called, left correction notice, NEC 230.28 only power service drop conductors shall be permitted to be attached to mast,312.5 shall provide abrasion protection for all conductors at panel, 358.30 shall provide secure fastening of riser within 3' of termination (guy kit), 250.52(A) shall use metal water pipe within 5' of entering buildig as ground electrode, NOTE: shall call for p/s inspection
|