Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberELE11-02806
StatusFinaled
Name DOHERTY ELECTRIC
Site Address 150 N CAPITOL BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
Electrical Permit - Alteration: Code upgrades, lighting impovements, add outlet circuits, misc. electrical.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/12/20136/13/20136/13/2013APASS
DetailsRock A. Hudson
last of the project... surface mounted lights in the basement/parking garage call mike 1/2 hour prior if needed ###-#### Phone #: ###-#### >> Inspection requested via web by Mike Basye Project complete Final ok
Final5/9/20135/9/20135/9/2013APART
DetailsRock A. Hudson
Rock we would like to see you right before noon if that will work. we are wanting a final for the 3rd floor only. we do not want to final the permit, we have other work to do on other floors Phone #: ###-#### >> Inspection requested via web by Shawna Gates
3rd floor city council chambers, council office, lobby area and attrium. Final ok
Final5/9/20135/9/20135/9/2013PCANC
DetailsRock A. Hudson
several areas on the 3rd floor, partial final call mike 1/2 hour prior ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Final5/8/20135/9/20135/9/2013ACANC
DetailsRock A. Hudson
final several areas third floor council chambers and atrium area....we are not wanting a final for the entire building yet. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In5/1/20135/1/20135/1/2013PPASS
DetailsRock A. Hudson
re-inspect the control room ceiling...atrium area ceiling inspection ..call mike ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates 3rd floor control room ceiling rough in ok cover
Electrical Rough-In4/30/20134/30/20134/30/2013AFAIL
DetailsRock A. Hudson
3rd floor control room ceiling, Shane has notes on the plans for todays inspection, call Mike if needed ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Flourescent fixture shall be supported other than grid
Electrical Rough-In4/25/20134/25/20134/25/2013APASS
DetailsRock A. Hudson
ceiling inspections 3rd floor east and south hallway...also the area behind the Dias knee space. call Mike ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates
East and south hallway ceilings and dias under counter outlets and lighting rough in ok cover
Electrical Rough-In4/23/20134/23/20134/23/2013APASS
DetailsRock A. Hudson
ceiling inspection 3rd floor atrium office and hallway in front of elevator #2..call mike ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates
Atrium hall and area by elevator #2 ceiling rough in ok cover
Electrical Rough-In4/19/20134/19/20134/19/2013PPASS
DetailsRock A. Hudson
re-inspect lobby ceiling low volt cable installation Phone #: ###-#### >> Inspection requested via web by Shawna Gates Reinspect council lobby area. Rough in ok cover
Electrical Rough-In4/17/20134/18/20134/18/2013APASS
DetailsRock A. Hudson
Rock, we need the rest of the lobby and north hallway ceilings approved for cover, call mike ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates
Hall north of elevator ceiling rough in ok cover.
Area in front of elevator by city council chamber to be left open due to low volt wiring laying on grid
Electrical Rough-In4/16/20134/17/20134/17/2013APASS
DetailsRock A. Hudson
3rd floor ceiling . elevator lobby and north hallway...see plans for highlighted areas call mike 1/2 prior ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates please the areas open to check boxes marked on print. rough in ok cover
Electrical Rough-In4/10/20134/10/20134/10/2013APASS
DetailsRock A. Hudson
two more rooms (ceilings) north of the council chambers Phone #: ###-#### >> Inspection requested via web by Shawna Gates
Council office and admin. ceiling rough in ok cover
Electrical Rough-In4/9/20134/9/20134/9/2013APASS
DetailsRock A. Hudson
ceiling inspection on the west hallway behind the council chambers Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough in west and south hall ceiling ok
Electrical Rough-In4/6/20134/8/20134/8/2013APASS
DetailsRock A. Hudson
ceiling inspection on several smaller offices around the council chambers....call mike 1/2 prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates Kitchen and storage ceiling rough in ok cover
Electrical Rough-In4/4/20134/5/20134/5/2013APASS
DetailsRock A. Hudson
Reinspect 3rd floor ceiling...council chambers..call mike 1/2 hour prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates east rooms in counsel chambers and kitchen and storage Ceiling rough in ok cover
Electrical Rough-In4/4/20134/4/20134/4/2013AFAIL
DetailsDoug A Poedy
the rest of the council chambers area ceiling call mike 1/2 prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates. NEC 330.30. MC cable shall be secured within 12 inches.NEC 314.17 KO seals to be installed in unused openings.
Electrical Rough-In4/3/20134/3/20134/3/2013APASS
DetailsRock A. Hudson
3rd floor partial ceiling cover call mike ###-#### 1/2 hr prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates
Main area ceiling rough in ok cover
Rough-In Permanent Service3/26/20133/27/20133/26/2013APASS
DetailsRock A. Hudson
3rd floor rough in walls call mike 1/2 prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates New tenant space wall rough in ok cover
Electrical Rough-In3/26/20133/27/20133/26/2013PCANC
DetailsRock A. Hudson
3rd floor atrium wall rough in...call mike 1/2 prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In3/20/20133/21/20133/21/2013ACANC
DetailsRock A. Hudson
3rd floor atrium area walls..call mike 1/2 prior. ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Final3/14/20133/15/20133/15/2013APART
DetailsRock A. Hudson
Final for 3rd and 4th floor north end. Please call Mike 30 min. at ###-####. >> Inspection requested via web by Shawna Gates
3rd and 4th floor beam support areas final ok
Final3/13/20133/14/20133/14/2013ACANC
DetailsRock A. Hudson
Final for 3rd and 4th floor north end. Please call Mike 30 min. at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates
Electrical Rough-In3/13/20133/13/20133/13/2013PPASS
DetailsRock A. Hudson
Ceiling inspection, 3rd floor elevator lobby. Please call Mike 30 min. prior to inspeciton at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 3rd floor soffit by elevator rough in ok cover
Electrical Rough-In3/12/20133/12/20133/12/2013APASS
DetailsRock A. Hudson
4th floor ceiling inspection. Please call Mike 30 min. prior at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 4th floor ceiling rough in ok cover
Electrical Rough-In3/8/20133/8/20133/8/2013PPASS
DetailsRock A. Hudson
3rd floor ceiling, call mike prior Phone #: ###-#### >> Inspection requested via web by Shawna Gates
3rd floor Ceiling rough in ok cover
Electrical Rough-In3/6/20133/6/20133/6/2013AFAIL
DetailsRock A. Hudson
Ceiling inspection on 3 and 4th floor north end. Please call Mike 30 min, prior at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 3rd floor- Multiple violations created by steel beam support. conduits unsupported, open knock-outs in boxes, data wiring supported by grid.
4th floor not ready.
Final2/28/20133/1/20133/1/2013APART
DetailsRock A. Hudson
Final on the first and second floor. Please call Mike , 30 minutes prior to inspection at 2839095. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 1st floor purchasing area 2nd floor. final ok
Electrical Rough-In2/28/20132/28/20132/28/2013APASS
DetailsRock A. Hudson
2nd floor ceiling inspection. Please call mike 30 min. prior at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates
NEC 300.11 Cables shall not be supported by ceiling grid.
NEC 314.23 D2- Boxes and raceways secured with support wires shall be fastened at each end so as to be taut with in ceiling cavity. Corrections done. 2nd floor ceiling rough in ok cover
Electrical Rough-In2/26/20132/26/20132/26/2013APEND
DetailsRock A. Hudson
Ceiling inspection. Please call Mike 30 min. prior at ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna
After conversion to cat-6 system. Cat-5 wiring being removed do to it being abandoned
Electrical Rough-In2/13/20132/13/20132/13/2013APASS
DetailsRock A. Hudson
Ceiling inspection 1st and 3rd floor. Please call Mike 30 Min. prior so he can meet you onsite. His cell no. is ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates 3rd floor raised floor area. 1st floor ceiling rough in ok cover
Electrical Rough-In2/12/20132/12/20132/12/2013APASS
DetailsRock A. Hudson
Ceiling inspection 1st floor. Please call Mike at ###-#### 30 min. prior so he can meet you on site. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 1st floor stair entrance ceiling rough in ok cover
Electrical Rough-In2/5/20132/5/20132/5/2013APASS
DetailsRock A. Hudson
3rd floor walls and ceiling. Please call Mike at ###-#### 30 min prior so he can meet you onsite. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Small room by north stair ceiling and 3rd floor wall rough in ok cover
Electrical Rough-In1/29/20131/29/20131/29/2013APASS
DetailsRock A. Hudson
2nd and 3rd floor council chambers soffit cover. Call Mike 30 min. prior at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Wall on 2nd and 3rd floors rough in ok cover
Electrical Rough-In1/23/20131/23/20131/23/2013PPASS
DetailsRock A. Hudson
3rd flr r/i walls//call Mike Phone #: ###-#### Walls marked in blue on print. Rough in ok cover
Electrical Rough-In1/16/20131/16/20131/16/2013PPASS
DetailsRock A. Hudson
Please call 30min prior for meeting - Mike Phone #: ###-#### 4th floor benches. 3rd floor walls marked on print in blue rough in ok cover
Electrical Rough-In1/8/20131/9/20131/9/2013APASS
DetailsRock A. Hudson
Please call mike 30 min. Prior to inspection at ###-####. 1st floor wall rough in. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Break room area wall rough in ok cover
Electrical Rough-In11/15/201211/16/201211/16/2012APASS
DetailsRock A. Hudson
Please call Mike 30 min. prior so he can meet you onsite, cell no. is ###-####. 1st floor vestibule - cover inspection. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Vestibule ceiling rough in ok cover
Final11/14/201211/15/201211/15/2012APART
DetailsRock A. Hudson
1st floor only, main lobby and misc. offices finale for occupancy..call mike 1/2 hour prior, ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Plug mold needs cover in N.W. office, data wiring needs supported off grid right of elevators. Corrections done.
Electrical Rough-In11/9/201211/9/201211/9/2012PPASS
DetailsRock A. Hudson
Lobby ceiling rough in ok cover
Electrical Rough-In11/8/201211/9/201211/9/2012APASS
DetailsRock A. Hudson
1st floor ceiling misc. offices...Call Mike 1/2 hour prior ###-#### Phone #: ###-#### >> Inspection requested via web by Shawna Gates Office area 1st floor only not lobby area ceiling rough in ok cover
Electrical Rough-In11/6/201211/7/201211/8/2012AFAIL
DetailsRock A. Hudson
Please call Mike 30 min. prior at ###-####. Ceiling inspection. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Existing wiring in need of repair. 1. 314.17 (B) Metal boxes for HVAC shall have insulating bushing where conductors enter. 2. 314.23 (D)2 Boxes shall be supported by support wires at both ends HVAC. 3. 314.25 All j-boxes shall have covers.4. 110.12 (A) Unused openings in boxes shall be closed. 5. 300.11 Cables and raceways shall not be supported by ceiling grid. 6. 800.100(D) A cable tray is considered an equiptment grounding conductor. A #6 minimum insulated grounding conductor shall be installed between cable tray and building grounding system. 7. 330.30 (B) MC cable shall be supported with in 12 " of every box or fitting.
Electrical Rough-In10/9/201210/9/201210/10/2012PPASS
DetailsRock A. Hudson
mike Phone #: ###-#### Mayor's office ceiling rough in ok cover
Electrical Rough-In10/2/201210/2/201210/2/2012PPASS
DetailsRock A. Hudson
Ceiling inspection. Please call Mike 30 min. prior at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 3rd floor conference rm only rough in cover ok
Electrical Rough-In9/26/20129/27/20129/27/2012APASS
DetailsDaryl DeGrange
this is a re-inspection on the 1st floor. Work completed by city. Please call Mike 30 in. prior at ###-####. Thank you!! Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover ceiling grid 1st floor Financial services
Electrical Rough-In9/20/20129/20/20129/20/2012APASS
DetailsDaryl DeGrange
Ceiling inspection 1st and 2nd floor. Please call Mike 30 min. prior to inspection at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover 2nd floor only 1st needs ko plugs in juntion boxes and data wiring supported off grid
Electrical Rough-In9/18/20129/18/20129/18/2012APASS
DetailsDaryl DeGrange
Please call Mike 30min. prior to inspection ###-####. 1st floor, rough in walls. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover walls
Electrical Rough-In8/29/20128/29/20128/29/2012APASS
DetailsDaryl DeGrange
Please call Mike 30 minutes prior so he can meet you onsite. Mike''s cell is ###-####. Cover inspection for walls and ceilings. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Rough-in ok cover ceiling grid 2nd floor area of old atrium, 3rd floor north exterior wall of atrium area
Electrical Rough-In8/16/20128/17/20128/17/2012APASS
DetailsDaryl DeGrange
Please call Mike 30 minutes prior at ###-####. Inspection is south and east entry - cover inspection. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover recessed can luminaires
Final7/25/20127/25/20127/25/2012APART
DetailsDaryl DeGrange
call Mike ###-####...we need an occupancy final for the first floor, 2nd floor and basement , this is for phase one only, the city is wanting to move in to these spaces this weekend Phone #: ###-#### >> Inspection requested via web by Shawna Gates partial final, temporary occupancy ok for first phase 1st floor,2nd floor,basement
Electrical Rough-In7/10/20127/11/20127/11/2012APASS
DetailsDaryl DeGrange
Ceiling inspection. Please call Mike at ###-#### 30 min. prior so he can meet you onsite. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover ceiling grid first phase first floor, Second floor old atrium area- walls only
Electrical Rough-In6/28/20126/28/20126/28/2012PFAIL
DetailsDoug A Poedy
Please call Mike 30 min. prior to inspections so he can meet you on site. Mike''s cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates
Existing electrical needs to be brought to code(high and low voltage)
Electrical Rough-In5/31/20126/4/20126/4/2012APASS
DetailsDaryl DeGrange
2nd floor ceiling grid Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover ceiling grid
Electrical Rough-In5/24/20125/25/20125/25/2012APASS
DetailsDaryl DeGrange
Please call Mike 30 min prior so he can meet you. Mikes cell no. is ###-####. >> Inspection requested via web by Shawna Gates rough-in ok cover under counter walls 2nd floor reception area
Electrical Rough-In5/8/20125/8/20125/8/2012APASS
DetailsDaryl DeGrange
Please call mike 30 min prior to inspection at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover (3) hard lid area (3) columns
Electrical Rough-In4/24/20124/24/20124/24/2012APASS
DetailsDaryl DeGrange
Please call Mike 30 minutes prior so he can meet inspector. His cell is ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover ceiling grid and walls as per marked in blue and dated 4/24/12
Electrical Rough-In4/4/20124/4/20124/4/2012PPASS
DetailsDaryl DeGrange
Please call Mike 30 minutes prior to inspection. is cell no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover 2 short walls as marked on plans and dated
Electrical Rough-In3/28/20123/29/20123/29/2012APASS
DetailsDaryl DeGrange
2nd floor cover- Mike is the contact. Please call 30 minutes prior to inspection. Cell no. is ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover walls 2 areas as marked on contracors plans in yellow and dated 3/29
Electrical Rough-In3/27/20123/27/20123/27/2012APASS
DetailsDaryl DeGrange
Mike is the contact his cell no. is ###-####. Please call 30 min. prior to inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok cover 1st floor area as marked in yellow
Conference3/21/20123/21/20123/21/2012ADONE
DetailsJack Frank
Electrical Rough-In3/12/20123/13/20123/13/2012PPASS
DetailsDaryl DeGrange
Basement Lab, Ceiling inspection. Mike is the contact. Please call 30 minutes prior to inspection at ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates rough-in ok relocate 2- 2x4 layin troffers with switch
Electrical Rough-In3/12/20123/13/20123/12/2012PCANC
DetailsDaryl DeGrange
Please call Mike 30 minutes prior to inspection. Cell No. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates Inspection cancelled from web by: Shawna Gates