Final | 1/31/2012 | 1/31/2012 | 1/31/2012 | P | PASS |
Daryl DeGrange
|
|
|
Please call Jim for access code at ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by Paula Gratiot final ok
|
Final | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | NR |
Daryl DeGrange
|
|
|
Call Jim for access. Phone #: ###-#### >> Inspection requested via web by Paula Gratiot
|
Electrical Rough-In | 12/22/2011 | 12/22/2011 | 12/22/2011 | P | PASS |
Daryl DeGrange
|
|
|
Location is unlocked. The builder, Mike of D&H Construction will be present. Phone #: ###-#### >> Inspection requested via web by Paula Gratiot rough-in ok cover
|