Final | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | PASS |
Doug A Poedy
|
|
|
|
Rough-In Permanent Service | 12/22/2011 | 12/28/2011 | 12/28/2011 | A | FAIL |
Jack Frank
|
|
|
Customer asked for the earliest possible appointment. Thank you. Phone #: ###-#### >> Inspection requested via web by Randy Fletcher called corr. bond soffit vent, provide W/R, T/P recept and inuse cover, shall not use sheetmetal screws for bonding
|
Electrical Rough-In | 12/22/2011 | 12/23/2011 | 12/22/2011 | A | CANC |
Jack Frank
|
|
|
Hot tub installation Phone #: ###-#### >> Inspection requested via web by Randy Fletcher Inspection cancelled from web by: Randy Fletcher
|