Final | 1/31/2012 | 1/31/2012 | 2/1/2012 | P | PASS |
Jack Frank
|
|
|
kenny Phone #: ###-#### ok
|
Final | 1/24/2012 | 1/25/2012 | 1/24/2012 | A | FAIL |
Jack Frank
|
|
|
Kenny Phone #: ###-#### violation not correced derate wires at correct % note 45%, also only one neutral per terminal
|
Permanent Service | 1/13/2012 | 1/13/2012 | 1/13/2012 | P | FAIL |
Jack Frank
|
|
|
Kenny Phone #: ###-#### called correction posted seal all unused openings,, derate conductors for conduit fill,ID white wires in cables used as phase conductors, shall use listed splicing device for cu. and al.
|
Permanent Service | 1/4/2012 | 1/5/2012 | 1/5/2012 | A | PASS |
Bob Reichert
|
|
|
Kenny Phone #: ###-#### at final check for a/c line set not in dedicated space, p/s o/h rec ok
|
Conference | 12/28/2011 | 12/28/2011 | 12/28/2011 | P | PASS |
Jack Frank
|
|
|
Temp pole power Phone #: ###-#### >> Inspection requested via web by Jesse Fuentes t/s o/h new ok
|